Fire - electrical rough in has been done.
Rain - plumbing rough in has been done.
I also have a bathtub, windows and half a roof. It is supposed to be a whole roof but the roofing guys - well, let's just say they've been a little tardy but now all is well and the roof is getting up there. The windows are stacked up near the fence so I hope nothing lands on them in the expected windy conditions tonight.
Sadly the camera has run out of oomph so no photos until tomorrow.
The electricians turned up at 5.40am! I did a 'little' revision of the electrics - added about 20 powerpoints, a heap of downlights (fluoros) and surge protection for the whole house. I forgot about fairy lights for the garden apparently. Now I sit and wait for the extras bill - again. Have already upgraded to anticon blanket and different internal doors. I figure that anything that will be hard/expensive to do later, should get done now. Even if I don't get my new lounge suite :( and my old bed isn't really the reason I wake up stiff and sore.
Now I have to draw a wiring diagram for the network, tv and phone cables. I'm so sleepy. And I have to do a SQL test sometime before Sunday night too. eerrrrkkkkkkk
No comments:
Post a Comment