Tuesday, January 13, 2009
Water
Shower screens and wardrobe doors for the other bedrooms are on their way. Security screens on order.
The tank is lurking somewhere - as soon as we get stormwater trenches done, I'm guessing the plumber will be back to do that.
Electrician is probably next week.
And still no word regarding my access letter grrrrrrrrrrrr.
Sunday, January 11, 2009
Tiled
They are still grotty from the grout.


You can see the flattened out backyard (side yard?) through the doors - it looks a lot bigger now.I heard a rumour that the plumber will be here in the next few days. Hopefully the next pics will be of plumbing and light fittings installed.
Almost there, almost there!
Sunday, January 4, 2009
A new year
The internal painting is more or less finished. Paul just has a few bits and pieces to do or touch up. He said he won't be doing the outside until all the downpipes are done - erm, cos he has to paint those for a start lol.
Damien finished all the wet area tiling and grouting and headed off to niece Melanie's house to do hers. She has an en suite shower recess that is nearly the size of my whole en suite so I think he'll be there a while!
I had to share a photo of some of the grouted tiles - they look so much better.
I scored well from Santa :) two Maxwell & Williams white dinner sets, a steam mop, and stainless steel kettle and toaster. I have also hit the sales and bought myself a few utensils and a couple of Maxwell & Williams pasta bowl sets (half price!).
Saturday, December 20, 2008
Splish Splash

Powder


Laundry - this has the same floor tiles as will be throughout the rest of the house. It looks good.

Ensuite


Bathroom

The colour of the tiles isn't showing well on my monitor - the bathroom ones seem to have an orangey tinge which they don't have in reality.
Friday, December 19, 2008
FFS!
We got a reply from the council regarding the sub division application and stormwater plan. Basically they're happy with it, and approval is pending. However, since the stormwater connection to the council pipes is on next door's block - with an easement complete with one of those inspection thingies - we need to get a letter saying it's ok to access the property, if needed, to connect into the pipe.
House next door is owned by Dept Housing. Ring up local office, get nice girl "oh that shouldn't be a problem, I'll find out about the proper letter and get it out to you. Just forward me the council email so I know what exactly they want". Too easy.
Right
Phone call from some guy, presumably Nice Girl's superior officer. Raving about needing more information for council engineers to assess (wtf?);
might restrict their future development plans (er, your property is just a normal house block);
might affect their stormwater run off (into a huge council main??);
compensation mentioned a few times (for walking onto the block???);
two weeks notice to tenants for works on their block. (like you wouldn't let them know, just as a courtesy even)
Blah blah. He's not listening to a word I said - key words being it's a COUNCIL pipe not yours (idiot), ACCESS only (moron), IF NEEDED (d!ckwad). Gives me an address to WRITE to the works engineer ffs!!
We could have approval soon since council don't take long breaks at Christmas but nooooo!!! Stupid government bureaucracy and the idiots who run it.
Yes yes, I know I work for a govt department, but if I got things THAT wrong I'd get my butt kicked by my manager.
Bring on Monday!!
< / rant>
The tiler, Damien, is a machine. He works dawn till dusk and will be here Saturday and possibly Sunday, to get the wet areas finished. Since Thursday lunchtime, he has tiled floors in main bathroom, en suite and laundry; prepared floor and tiled shower recess floor and walls in main bathroom; prepared and tiled floor of shower recess in en suite!!
I'm still not convinced that the benchtop in en suite is ok - it all looks a bit too grey and brown to me. I guess that's what bright towels and plants are for. Wonder if I should pretend I employed a decorator and add a large pot with sticks.
Haven't seen the painter for a few days. Wondering if I should smack Big G for having a heart to heart chat (apparently) with him the other day about life. I could have told them the answer is 42 - or something.
If I can get in before it gets too dark, I'll get some tiled pics on the weekend.
Tuesday, December 16, 2008
Cupboards and handles
The handles are the same on all cabinets; the ones in bathrooms are just a smaller version.
Main bathroom - roman marble top and parchment doors
Powder - roman marble top and parchment doors
En suite - pearl grey top and shannon oak doors
Laundry - roman marble top and shannon oak doors
The laundry was supposed to be shannon oak cabinets with parchment benchtop and top cupboards. Not sure what happened there, but it looks really good, so I'm not about to complain.


Kitchen with handles and back panel installed. Note how it is trained to hold my coffee cup already.
The tiler is due any day now too. And the painter continues with the gloss on doors and architraves.
Saturday, December 13, 2008
Stoned
Looking back towards front door
Kitchen from dining room
Love my drawers! I even took a cup down there to make sure it would fit into one of them :)
I have picked up the oven and cooktop; the dishwasher is on backorder. As is the fridge. Once they are all installed, I can decide what colour the glass splashbacks should be - they get measured and installed as the very last thing in the kitchen. I chose handles that would go with all the stainless steel.